early enclosure ideas
Astrohaven
Construction Trailer
speckle imager, quantum entangler?
MSIP
Existing drives are ~25 years old & discontinued
Reduce vibration, improve tuning
Prototype assembly and short pivot arm done
all 12 drives and motors (plus spare) in hand from Parker
S2 EL drive assembly removed and reinstalled
Spare Dojen obtained
Install during daytime, but some nights needed for software and tuning
New fiber network (new IP pool), new spycam system (3 per telescope up to 4k+audio, 3 w/ pan/tilt in lab), more sensors (rh, temp) and control
(CHARA Array Integrated Optics Testbed)
collaboration with Leibniz Institute for Astrophysics Potsdam (AIP)
connectorized interchangable ULI optics
JHK bands
(Siliprandi, Labadie, Madhav, Dinkelaker, Thompson, BenoƮt)
Currently have two injection stages, CRED1 arrives ~April
Siliprandi et al. 2022
MIRX
MYSTIC
SILMARIL
SPICA
CHARIOT
PAVO
SPICA
VIS BEAMS
METROLOGY
STS/STST
BEAM SAMPLERS
BEAM SAMPLERS
BEAM SAMPLERS