In collaboration with Shrutheesh Iyer (project lead) and Prof. Zachary Kingston
October 9, 2026
Full pipeline from a raw 166k-point depth camera cloud (filter, build CAPT, plan, simplify), UR5, one CPU core
Motions in Microseconds via Vectorized Sampling-Based Planning, W. Thomason, Z. Kingston, L. E. Kavraki, 2024
Collision-Affording Point Trees: SIMD-Amenable Nearest Neighbors for Fast Collision Checking,
C. W. Ramsey, Z. Kingston, W. Thomason, L. E. Kavraki, 2024
Learning the Metric of Task Constraint Manifolds for Constrained Motion Planning,
F. Zha, Y. Liu, W. Guo, P. Wang, M. Li, X. Wang, J. Li, 2018
Vectorizing Projection in Manifold-Constrained Motion Planning for Real-Time Whole-Body Control,
S. R. Iyer, I.-C. Chang, A. Z. Liu, Y. Gu, Z. Kingston, 2026
High iteration-count failure
High iteration-count success
IK
ReVAMP: Vector-Accelerated Motion Planning for Kinematically-Constrained Systems via Reparameterization,
S. R. Iyer, T. Cohn, Z. Kingston, 2026
median planning time, 14-DoF bimanual iiwa (Dual-Follower)
median replanning time on hardware, FR3 held to the maze plane, moving obstacles, 2.5 GHz i5
Case study: bimanual pick-and-place on the RB-Y1
Every failed planning call runs to its 30 s timeout
79% of IK time goes to ranking candidates that are thrown away
median per box pose (IFT: 43.6 s)
grid points planned (IFT: 20/20)
per failed planning call (IFT: 30 s timeout)
Towards Practical Finite Sample Bounds for Motion Planning in TAMP,
S. Shaw, A. Curtis, L. P. Kaelbling, T. Lozano-Pérez, N. Roy, 2024
October 9, 2026
In collaboration with Shrutheesh Iyer (project lead) and Prof. Zachary Kingston