Beam incident in TT40 transfer line at SPS
GROUP 9
Andrea Apollonio
Timmy Lensch
Taiee Liang
Andrea Santamaria
James Steimel
Newport Beach 2014
Brings 450 GeV proton beams and heavy ions from the Super Proton Synchrotron (SPS) to the Large Hadron Collider (LHC).
TT40 transfer line layout
TT40 transfer line setup
Septum
Kicker
Beam momentum (GeV/c)
Gap height (mm)
Max. current (kA)
Deflection (mrad)
450
20
24
2.25
450
32 to 35
2.56
0.48
The incident
A beam was deflected into the aperture
Number of protons
Beam energy
Damage
TRANSFER LINE DAMAGE DURING HIGH INTENSITY PROTON BEAM
EXTRACTION FROM THE SPS IN 2004 - B.Goddard (HB2006, Tsukuba, Japan)
The septum (MSE) tripped just before the extraction, and this was not seen by the interlock system in time.
Beam size
CONTROL ROOM
INTERLOCK
PC kicker PC septum
EXTRACTION SYSTEM
Kicker Septum Water cooling Temp.sensor
Operators
Switch off PC
Temp. sensor
How the system works
CONTROL
ACTIONS
FEEDBACK
Water
Interlock configuration
Signal is communicated after taking control actions
(...)
Beam
Switch off PC
CONTROL ROOM
INTERLOCK
PC kicker PC septum
EXTRACTION SYSTEM
Kicker Septum Water cooling Temp. sensor
Operators
What happened
EM coupling
CONTROL
ACTIONS
FEEDBACK
Beam
CONTROL ROOM
INTERLOCK
PC kicker PC septum
EXTRACTION SYSTEM
Kicker Septum Water cooling Temp. sensor
Operators
Temp. sensor
What happened
EM coupling
CONTROL
ACTIONS
FEEDBACK
Beam
Unphysical temperature
CONTROL ROOM
EXTRACTION SYSTEM
Kicker Septum Water cooling Temp. sensor
Operators
Temp. sensor
What happened
EM coupling
CONTROL
ACTIONS
FEEDBACK
Beam
INTERLOCK
Unphysical temperature
Spurious signal
PC kicker PC septum
CONTROL ROOM
INTERLOCK
PC kicker PC septum
EXTRACTION SYSTEM
Kicker Septum Water cooling Temp. sensor
Operators
Temp. sensor
What happened
Masking of temperature interlock
EM coupling
CONTROL
ACTIONS
FEEDBACK
Beam
Unphysical temperature
Spurious signal
CONTROL ROOM
INTERLOCK
PC kicker PC septum
EXTRACTION SYSTEM
Kicker Septum Water cooling Temp. sensor
Operators
Temp. sensor
What happened
EM coupling
Water cooling
Switch off PC
EM coupling
CONTROL
ACTIONS
FEEDBACK
Beam
Masking of temperature interlock
Unphysical temperature
Spurious signal
Evolution of the septum current
CONTROL ROOM
INTERLOCK
PC kicker PC septum
EXTRACTION SYSTEM
Kicker Septum Water cooling Temp. sensor
Operators
Temp. sensor
What happened
EM coupling
Water cooling
Switch off PC
Wrong beam deflection
EM coupling
CONTROL
ACTIONS
FEEDBACK
Beam
Masking of temperature interlock
Unphysical temperature
Spurious signal
Beam
CONTROL ROOM
INTERLOCK
PC kicker PC septum
EXTRACTION SYSTEM
Kicker Septum Water cooling Temp. sensor
Operators
Temp. sensor
What happened
EM coupling
Water cooling
Switch off PC
Wrong beam deflection
Switch off PC
Delayed extraction inhibit
EM coupling
CONTROL
ACTIONS
FEEDBACK
Beam
Masking of temperature interlock
Unphysical temperature
Spurious signal
Beam
CONTROL ROOM
INTERLOCK
PC kicker PC septum
EXTRACTION SYSTEM
Kicker Septum Water cooling Temp. sensor
Operators
Temp. sensor
Beam
EM coupling
Water cooling
Switch off PC
Beam
Wrong beam deflection
Switch off PC
Delayed extraction inhibit
Systemic view of the accident
No component failures: everything behaved as designed, but ...
Masking of temperature interlock
Unphysical temperature
Spurious signal
CONTROL
ACTIONS
FEEDBACK
EM coupling
Systemic view of the accident
... unforseen interactions
CONTROL ROOM
INTERLOCK
PC kicker PC septum
EXTRACTION SYSTEM
Kicker Septum Water cooling Temp. sensor
Operators
Temp. sensor
Beam
EM coupling
Water cooling
Switch off PC
Beam
Wrong beam deflection
Switch off PC
Delayed extraction inhibit
Masking of temperature interlock
Unphysical temperature
Spurious signal
CONTROL
ACTIONS
FEEDBACK
EM coupling
Systemic view of the accident
... lack of information
CONTROL ROOM
INTERLOCK
PC kicker PC septum
EXTRACTION SYSTEM
Kicker Septum Water cooling Temp. sensor
Operators
Temp. sensor
Beam
EM coupling
Water cooling
Switch off PC
Beam
Wrong beam deflection
Switch off PC
Delayed extraction inhibit
Masking of temperature interlock
Unphysical temperature
Spurious signal
CONTROL
ACTIONS
FEEDBACK
EM coupling
Systemic view of the accident
... wrong control logic
CONTROL ROOM
INTERLOCK
PC kicker PC septum
EXTRACTION SYSTEM
Kicker Septum Water cooling Temp. sensor
Operators
Temp. sensor
Beam
EM coupling
Water cooling
Switch off PC
Beam
Wrong beam deflection
Switch off PC
Delayed extraction inhibit
Masking of temperature interlock
Unphysical temperature
Spurious signal
CONTROL
ACTIONS
FEEDBACK
EM coupling
Systemic view of the accident
... 'unlucky' extraction timing
CONTROL ROOM
INTERLOCK
PC kicker PC septum
EXTRACTION SYSTEM
Kicker Septum Water cooling Temp. sensor
Operators
Temp. sensor
Beam
EM coupling
Water cooling
Switch off PC
Beam
Wrong beam deflection
Switch off PC
Delayed extraction inhibit
Masking of temperature interlock
Unphysical temperature
Spurious signal
CONTROL
ACTIONS
FEEDBACK
EM coupling
Not only component failures lead to accidents...!
Energy deposition of mis-steered SPS proton beam
Proton beam source term
3.2 x
450 GeV
2.31 MJ
0.7 x 0.7
0.6
2.31 MJ
Energy Deposition in Steel and Copper
Energy deposition and eventual ΔT highly dependent on number of incident protons
Objectives
Sensors for experiment
Material Qualification Test (1)
Materials of interest
Material Qualification Test (2)
Text
Maximum allowed intensity at 450 GeV
New protection measures
Management suggestions
Beam off
Beam on
Commissioning plan
SPS is one of the main contributors to LHC unavailability
B. Todd
Impact on availability
Impact on availability
Downtime caused by the accident:
(magnet replacement, vacuum pumping...)
HL-LHC aims at
per day
2 days
16% of the luminosity production in 2012
in 160 days of operation
For two days we get
99.8%
Expert estimation of MTBF:
3 years
Summary
Thank you!