Risk Assessment

OPENING SEQUENCE:

Risk 1

The first main risk for our group was the fact that we were filming in a graveyard. Obviously, a graveyard is sensitive location for many people, we therefore got permission from the grounds keeper and he granted us permission to film. 

Risk 2

The seconds risk was the fact that nearby to us was a road. This created the risk of being hit by a car if we weren't careful when filming.

Risk 3

There was also a tripping hazard. As there are many gravestones and bushes and varied terrain we could have fallen over and hurt ourselves or damaged our equipment.

Risk 4

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Morbi nec metus justo. Aliquam erat volutpat.

Made with Slides.com