Data-driven safety early warning system for underground construction
Dr. Ling Ma
Huazhong University of Sci & Tech (HUST)
© 2014, Dr. Ling Ma
HUST BIM center
Wuhan
© 2014, Dr. Ling Ma
Safety Early-warning System
© 2014, Dr. Ling Ma
HUST BIM center
Daily Inspection - Collecting data
Ma, L., Early Warning Analysis for Safety Risk of Metro Tunnel Construction Based on a Spatio-Temporal Model of Ground Settlement, China National Natural Science Funds for Young Scholar, $41,000, PI, 51408247, 2015-2017,
© 2014, Dr. Ling Ma
HUST BIM center
Semantic enrichment
© 2016, Dr. Ling Ma
ETL-From Data to Information
For each settlement measurement
●Time of the measurement
●Position of the measurement
●Geological profile beneath the marker
●Tunnel face distance to the marker
© 2014, Dr. Ling Ma
HUST BIM center
Data Denoise
© 2014, Dr. Ling Ma
HUST BIM center
Settlement Distribution
© 2014, Dr. Ling Ma
HUST BIM center
Knowledge discovery from the data
The settlement trough width is correlated with the thickness of soil layers
The settlement trough width is time invariant
© 2016, Dr. Ling Ma
From Knowledge to Wisdom
© 2014, Dr. Ling Ma
HUST BIM center