Rapid assessment of earthquake damaged building using laser scanning and Building Information Modeling
Dr. Ling Ma
Technion - Faculty of Civil and Environmental Engineering
© 2015, Dr. Ling Ma
Search & Rescue
Damage assessment
© 2015, Dr. Ling Ma
- Pre-event information
- Seismic response
- Outer appearance
As-built BIM model
Seismic Simulation
Remote Sensing
© 2015, Dr. Ling Ma
© 2015, Dr. Ling Ma
Four-story Reinforced Concrete and Post-Tensioned Concrete Buildings, December 2010 (from E-defense)
© 2015, Dr. Ling Ma
© 2015, Dr. Ling Ma
By Jiashu Liang
By Ashrant Aryal
By Ashrant Aryal
© 2015, Dr. Ling Ma
© 2015, Dr. Ling Ma
© 2015, Dr. Ling Ma
© 2015, Dr. Ling Ma
© 2015, Dr. Ling Ma
User prepared: Actual Positive (TP+FN)
Case | Precision (TP/PP) | Recall (TP/AP) |
Kocaeli | 81.98% | 80.77% |
Bingol | 76.57% | 78.35% |
System generated: Predictive Positive (TP+FP)
Intersection: TP
© 2015, Dr. Ling Ma
© 2015, Dr. Ling Ma
© 2015, Dr. Ling Ma
© 2015, Dr. Ling Ma