Pink octopus
Sprint
review
June 2019 - Lucidweb - Platform sprint 2
Ice
breaker
Celebrity priorization
there will be 16 celebrities to save in the sinking boat
1 lifeboat can take 3 people
we are pretty sure that the first lifeboat will success
we are pretty sure that the last lifeboat will fail
So choose wisely...
Velocity
Velocity
: 48 pts during 17 coding days
+3 free items
Average
: 2.8pts/cd
Estimation
: 91 pts / 18 cd = 5pts/cd
Ideal
: 8pts/cd
Main reason of gap :
first estimation
a lot of integration
some non-dev tasks
Velocity
: 40 pts during 15 coding days
+8 free items
Average
: 2.7pts/cd
Estimation
: 67 pts /
1
cd = 3.7pts/cd
Ideal
: 8pts/cd
Main reason of gap :
a free day
a lot of integration
too much free items
Technical debt
Documentation
: bad
Git flow
: correct
Versionning
: bad
Start state
: perfect
security
: correct
66 low, 1 moderate
Tests
: 2% (jest)
Duplicate code
: 3.7% (jscpd)
Lint
: not strict enough (eslint)
0 errors, 6warnings (1h)
Identified bugs
: 12
U0: 8
U1: 1
U2: 1
U3: 2
Documentation
: bad
Git flow
: correct
Versionning
: average
Start state
: perfect
security
: good
3 low, 2 moderate
Tests
: 1.6% (jest)
Duplicate code
: 1.3% (jscpd)
Lint
: not strict enough (eslint)
0 errors, 15warnings (2h)
Identified bugs
: 10
U0: 7
U1: 2
U2: 1
U3: 0
A general feeling
A tree of characters
Previous "resolution" review
Loïc
:
Keep and improve agility with a review after 3 sprint;
Do a tech lunch
Joachim
: Do a tech lunch
Adrian
: Do a JIRA/Confluence introduction
Eliana
: Tag every task that contain integration, if design are ready
Leen
:
Do a US meeting with short and long goals diff
team-building event
3 points...
... of pain
... of satisfaction
Draw me a potato
select the 3 more important fields
find 1 ideas to resolve those fields
... for neutral ideas
Next sprint (2w)
Thought for the next sprint ?
The codec challenge
The no-free-items challenge
Thank you
Made with Slides.com