Starting in late 2008 Craig Rothwell (and friends) launched a preorder (reaching 4000~)
and after partnering with CircuitCo started shipping units in 2010.
However, setbacks attributed to poor quality work caused high rates of failure. This was followed by more internal problems which lead to the project being placed on hold.
Under the control of a new leader Michael Mrozek (Evil Dragon),
construction was transferred to German company Global Components in late 2011.
The ‘Rebirth’ Pandora (using an updated SOC) was redesigned with known faults resolved.
This success was quickly followed by the construction of the upgraded 1Ghz SuperPandora.
Both models should be in stock now :)