Fire Extinguisher Inspections & 5 Year Sprinklers
MB Storm Drain Assets and PMs
1835 Owens St. Building Assets
New Building Turnover Maximo Matrix
New Building Asset and PM Setup:
Compliance:
Asset Data Capture and Safety Project
Northern California Maximo Users Group
Thermal Imaging - Electrical Sub Panels
Developed and Implemented EZMax offline
3rd Wave of EZMax and Maximo Training
Maximo and EZMax Development
Asset Data Capture
Created process for monthly and annual offline routed asset inspections in EZMax and Maximo
Trained Fire and Life Safety team on how to use the new process
Created process for 6 year and 12 year bottle inspections, testing, and replacements
Created procedure
Set up preventive maintenance schedules in Maximo
per building
Added assets into Maximo
Created procedure per EHS recommendations
Created route and scheduled seasonal preventive maintenance for Grounds team.
Built out attributes for each asset classification
Created new building asset and preventive maintenance document of requirements
Contacted building contractors and CP to establish process
Identified over 200 assets in building and loaded into Maximo
Scheduled preventive maintenance
Barcodes added to confirmed assets in the field
Removed non-existent assets
Captured additional assets and added to system
Confirmed existing assets and added photos and specifications
Lockout/tagout created for each verified or added asset
Scheduled on-site four day training of field technicians
Created procedure, added to Maximo
Pilot test completed on electrical sub panels out in the field (Housing Avenues)
Scheduled PMs per building for every three years
Training materials created - Notification Video and Newsletters
Developed, tested, and implemented offline mode in EZMax
Refreshed each group on current functions and protocol in EZMax and Maximo
Trained each group on new offline and push notification functions
Hosted this year's conference at
Mission Bay
Annual Review of HVAC trouble calls for Parnassus and Mission Bay
Annual Housing Preventive Maintenance Estimate
Various Reports for PM, Work Order, and Costs Oversight for Housing
Tableau Dashboard Pilot
PM Labor Resource Tool
Assisted Storehouse with Maximo setup
Challenges and Countermeasures
Projects not completed last year:
Mission Bay sewer maintenance, switchgear and primary switch assets, condition-based PMs
Challenges:
TIME:
PRIORITY CHANGES:
NEW PROJECT REQUESTS:
Committed to 7 primary projects for 2017
Completed 8, significantly advanced 2
Completed multiple secondary projects
Fire Alarm Device Testing & Annual Fire Sprinkler Head Inspections
Above Ground Storage Tank Maintenance
Mission Bay Child Care Assets and PMs
Compliance:
New Building Asset and PM Setup:
Asset Data Capture and Safety Plan Project
PM Forecast Tool - Creation and Rollout
Custodial Supervisor MaxWeb Start Center and Setup Calendar
Maximo 7.6 Upgrade
Asset Data Capture
Maximo and EZMax Development
Asset identification and collection
Create procedures
Schedule PMs
Sprinkler head inspection PMs already in progress
Asset identification and collection
Create procedures
Schedule PMs
Asset collection
Create any additional procedures, if needed
Schedule PMs
Barcoding of assets
Capture currently underway, organized by equipment classification.
Asset data and safety plans to be uploaded into Maximo as each classification is completed.
PM visual forecast generated for each team, currently in progress
Allows for adjustments to balance out the month-to-month workload.
Allows custodial leads to easily assign work, change work order statuses, and add labor hours
Real time custodial event set up calendar, direct connection from Maximo
Currently in development and scheduled to go live end of April
Training materials and schedule to be developed