Preventive Maintenance

Annual Review - 2018

 

Paul Landry

Bryan Garza

Xayaseth Boudsady

Roberta Kenyon

Preventive Maintenance 2018 Review

PROGRAM CHARGE To ensure that all UCSF assets under the charge of Facilities Services are aligned with industry-standard best maintenance practices in order to comply with code requirements, prevent emergency repairs due to equipment failure, and increase the lifetime of the assets.

PROGRAM SCOPE Development of new high-value preventive maintenance programs and performance of ongoing evaluation of the existing preventive maintenance system for the UCSF Campus.

Fire Extinguishers

&

5 Year Fire Sprinkler

 

Mission Bay

 

Storm Drains

Asset

Data Capture

& Safety

Plan

1835 Owens St.

 

Building Assets

New Building

Turnover Matrix

2017 Milestones

Thermal Imaging -

ESP

Maximo Users Group

 

Governance

Documents &

Records

Customer

Requirments

Resources

Financials

Program

Performance

Management

Annual Preventive Maintenance Plan Review with Chiefs, Superintendents, Matt Smyth and Paul Landry.

See current list of documents and records in Charter.

Ongoing Daily/Weekly/Monthly/Annual meetings with stakeholders.

We may want to bring in contracted assistance for projects in the future, but want to work out job duties and details before making any requests.

Overhead for 3 analysts, 1 temp admin assist .        EZmax: $60K

Maximo: $120K,    Consultant: $50K

Maximo 7.6 Upgrade: $50K

PM completion and compliance, PM project completion

Program Measure

  • Projects not completed last year

  • Time constraints

  • Shifting priorities due to University needs

Accomplishments

Challenges & Countermeasures

Program Requests

  • Request $50,000 for outside consultation for special projects, such as materials and storehouse integration.

  • Budget for 2nd round of Thermal Imaging Training, Maximo Certification, and Asset Management Certification

 

 

 

 

  • Fire Extinguisher Inspections and 5 Year Sprinkler PMs

  • MB Storm Drains

  • 1835 Owens St. (MB Medical Center Parking)

  • Asset Data Capture and LOTO

  • Thermal Imaging - Electrical Sub Panels

  • NorCal FMMug

  • 3rd Wave Training

2017 Accomplishments

Fire Extinguisher Inspections

Created Inspection Process - Offline

 

Trained Fire and Life Safety team

 

Created process for 6 year and 12 year bottle inspections, testing, and replacements

2017 Accomplishments

Created procedure

 

Set up preventive maintenance schedules in Maximo

per building

5 Year Sprinkler System Inspections and Testing

2017 Accomplishments

Mission Bay Storm Drains

Added assets into Maximo

 

Created procedure per EHS recommendations

 

Created route and scheduled seasonal preventive maintenance for Grounds team.

2017 Accomplishments

 

Built out attributes for each asset classification

 

Created document of requirements for building

turnover

New Building Maximo Matrix

2017 Accomplishments

Contacted building contractors and CP to establish process

Identified over 200 assets

 

Scheduled preventive maintenance

MB Medical Center Parking

2017 Accomplishments

Asset Data Capture and Safety Plan Project

Barcodes

2017 Accomplishments

3 year program, currently in 2nd year, 30% complete

Confirm and capture assets

Add photos and specifications

Lockout/tagout

Thermal Imaging - Electrical Sub Panels

2017 Accomplishments

Training scheduled

Procedure created

Pilot completed

PMs scheduled, 3 year, per building

3rd Wave Training

Training materials - Notification Video and Newsletters

 

Developed offline mode in EZMax

 

Refreshed each group on current and new functions and protocol

 

2017 Accomplishments

 

Hosted this year's conference at

Mission Bay

Northern California Maximo Users Group

2017 Accomplishments

HVAC trouble call dashboard - annual review

Annual Housing Preventive Maintenance Estimate

Various Reports for PM, Work Order, and Costs Oversight for Housing

Tableau Dashboard Pilot

2017 Secondary Accomplishments

PM Labor Resource Tool

Assisted Storehouse with Maximo setup

 

Built interactive dashboards

for Parnassus and Mission Bay

Temperature Issue Tracking Report

2017 Accomplishments

Challenges and Countermeasures

Deferred Projects

Mission Bay sewer maintenance

Switchgear and primary switch assets

Condition-based PMs

Challenges

TIME:

Day-to-day technical maintenance

Training, setup of new employees

Troubleshooting

Detailed PM schedule maintenance

Incoming flow of new project requests

PRIORITY CHANGES:

Reordered priorities as new needs revealed themselves across the year, e.g. New Building Turnover Matrix, asset classification specification development.

NEW PROJECT REQUESTS:

For 2018, we'll be implementing a formalized process to help maintain customer visibility.

Countermeasures

 

Summary of PM Project Commitments Completed

 

 

   

 

 

 

 

 

 

 

 

Committed to 7 primary projects for 2017

Completed 8, significantly advanced 2

Completed multiple secondary projects

Preventive Maintenance Metrics

Fire Alarm Devices and Sprinkler Heads

Asset identification

2018 Commitments

Create procedures

Schedule PMs

Sprinkler head inspection PMs already in progress

Above Ground Storage Tank Inspections

Asset identification and collection

2018 Commitments

Create procedures

Schedule PMs

Meet with certified engineers and EHS

Mission Bay Child Care

Asset collection

2018 Commitments

Create any additional procedures, if needed

Schedule PMs

Barcoding of assets

Asset Data Capture & Safety Plan Project

Capture currently underway

2018 Commitments

Asset data and safety plans to be uploaded into Maximo as each classification is completed.

PM visual forecast generated for each team

Enables long term planning to balance workload

PM Forecast Tool

2018 Commitments

Allows custodial leads to easily assign work, change work order statuses, and add labor hours

Custodial Supervisor MaxWeb

2018 Commitments

Real time custodial event set up calendar, direct connection from Maximo

Custodial Supervisor MaxWeb

2018 Commitments

Currently in development and scheduled to go live end of April

Primary focus starting 3/1/18

Maximo 7.6

2018 Commitments

Preventive Maintenance Charter

Preventive Maintenance Annual Review 2018

By robbiekenyon

Preventive Maintenance Annual Review 2018

Center of Excellence for UCSF, Campus Life Services: Facilities Services, Preventative Maintenance Program