Unit 2 - Metrics

  • "Quality metrics let you know when to laugh and when to cry", Tom Gilb

  • "If you can't measure it, you can't manage it", Deming

  • "Count what is countable, measure what is measurable. What is not measurable, make measurable", Galileo

THE IMPORTANCE OF METRICS

"Not everything that can be counted counts, and not everything that counts can be counted.", Albert Einstein

SOME WORDS OF WARNING

SUBJECTIVENESS OF QUALITY

"When a measure becomes a target, it ceases to be a good measure"

SOME WORDS OF WARNING

GOODHART'S LAW

E.g. Increase number of test cases, detected bugs, penalize false bug reports...

Fingerpointing, Create Reports, Evaluate People...

WHY DOES THAT HAPPEN?

BECAUSE OF THE TARGET OF MEASURING

Goodhart's laws occur when metrics are used for:

By measuring something, you should not always imply that the target is always improving that metric

WHY SHOULD WE MEASURE?

Improve Process

Increase Quality

Predict

Re-use Experiences

Estimate Cost, Effort, etc.

...

UNDERSTAND TO IMPROVE

What is measuring?

Collect (Data)

Calculate (Metrics)

Evaluate (Metrics)

Measures

Metrics

Indicator

Examples: 120 detected bugs, 12 months of project duration, 10 engineers working on the project, 100.000 Lines of Code (LOC)
Examples: 2 bugs found per engineer-month, 1.2 bugs per KLOC
Examples: bugs found per engineer-month might be an indicator of the test process efficiency, bugs/KLOC an indicator of code quality, etc..

Measure: Quantitative indication of the exact amount (dimension, capacity, etc.) of some attributes

Measurement: The act of determining a measure

Metric: is a quantitative measure of the degree to which a system, component or a process possesses a given attribute

Indicator: a metric that provides insights into the product, process, project

Key Concepts

Software Metrics

The 3 "P"s

Process
Project
Product

Process
Project
Product

Process Metrics: Related to the Software Development Life Cycle (e.g. the process throughout which we developed software). E.g. if a measure the defects I detect every month, I can get the metric "Defect Arrival Pattern" and get an indication on how good my process is about removing defects. E.g. If the number of defects detected increases with the time, I might need to increases testing, review the testing approach, add code reviews, etc...

Project Metrics: Related to the Team that developed the product, usually focused on efficiency, productivity, etc. Errors found per engineer-month is an example of a project metric that provides an indication of how the efficiency of my engineers with respect to detecting defects.

Product Metrics: Related to the finished product itself. They measure aspect such as product size, complexity, quality level... E.g in the case of quality, a possible metric is the Defect Density (number of defects / Size) which provides an indication of the quality of the product (the higher the worse)

The Example

120 defects detected during 6 months by 2 engineers

Defects defected every month: 10, 10, 20, 20, 25, 35

Defects remaining in the final product: 40 

Size of the Product: 40.000 Lines of Code

 



Process Metric: Defect Arrival Pattern 10, +0, +10, +0, +5, +10   -> Indicator of Maturity

Project Metric: 40 KLOC / 2 / 6 = KLOC per eng-month   -> Indicator of Productivy

Product Metric: 40 defects / 40 KLOC = 1 defect / KLOC -> Indicator of Quality

 

Measurements
Metrics and Indicators
Not all the metrics above are related to quality, let's focus on them

Software Quality Metrics

End Product

In Process

Intrinsic

Customer

Quality

Metrics

Metrics that provide indications of the Quality of the Product and Process
Metrics that provide indications of the Quality of the Process. Useful to take actions to improve the process the team is following for building products.
Metrics that provide indications of the Quality of the end of product. Don't take into account how the product has been developed as they just look at a snapshot.
Not useful to improve the current product but to understand its quality
Don't take into account the customer. The product and just the product. 
Focused on customer perception of the product. 

TYPE OF QUALITY METRICS

End Product Metrics do not let me improve product quality as it's too late

In-process metrics provide information about the process but not about the product as it's not finished

Prevent Bugs

Detect Bugs and fix them

Implement techniques to contain them
Measure and Calculate them 

AND

Anticipate end-product metrics

NO RETURN POINT

Controlled roll-out

A/B Testing

Beta programs

 

are intended to mitigate this "leap of faith"

QA Activities

Process metrics

KNOWING BEFORE IT'S TOO LATE

Intrinsic End Product Metrics

End Product

In Process

Intrinsic

Customer

Quality Metrics

Reliability

How often your product has a failure, i.e.

Probability of not having a failure during a specific amount of time

R(n) - Probability of not failing during n time

where n is the number of time units (days, hours...)

F(n) = 1 - R(n) - Probability of failing during n time

For instance, if the time is measured in days, R(1) is the probability of the product not having a failure during 1 day

Error Rate and Mean Time to Failure

Metrics very related to Reliability

Mean Time To Failure (MTTF) is the average time that occurs between two failures in the system

Error Rate is the average number of failures suffered by the system during a given amount of time

 

Error Rate = 1 / MTTF

Error Rate vs. Reliability

Relationship between them depends on the statistical distribution of the errors, not only on the error rate.

 

Example: The number of failures of one product during the days of one week is 10, 20, 30, 40, 50, 60, 70. A second product fails in the opposite way: 70, 60, 50, 40, 30, 20, 10.

 

Total number of errors is 280, Error Rate = 280/7 = 40 Errors / Day for both systems, but the Reliability of the first day is very different, right?

Error Rate vs. Reliability

If the system failures follow an exponential distribution:

R(t) = e^{-\lambda*t}
\lambda =

Constant Error Rate, in failures per unit of measurement, (e.g., failures per hour, per cycle, etc.)

Probability Density Function

Cumulative Density Function

Error Rate vs. Reliability

Think about Hardware...

Do you think Hardware has a constant error rate or do you think it changes with the time? If it changes with the time, how?

Error Rate vs. Reliability

Think about Hardware...

Error Rate vs. Reliability

Weibull distribution intended to be versatile and flexible enough to deal with this kind of Failure Rates

R(t) = e^{-(t/\eta)^\beta}
\lambda(t) = (\beta/\eta)*(t/\eta)^{\beta-1}

Fixed eta

Fixed eta

Error Rate vs. Reliability

Parallel and Series Systems

To not fail, the system requires all the three modules not to fail

To not fail, the system requires all the three modules not to fail at the same time

DEFECT DENSITY

Density = Amount / Volume

Density = Weight / Volume

for instance:

Defect Density =

Amount of Defects / Software Size

Number of Defects

  • Total number of defects remaining in the product
  • Total number of defects reported by end-users
  • Total number of critical/major/minor defects
  • Total number of new defects (in a new version)

Different types of densities can be calculated depending on the type of defects that we count into the numerator, for instance:

... in any case, the only difference is the name and the meaning of the metric, the way to calculate it is the same

Size of the Software

The easiest way to measure the size of a Software is counting the Lines of Code (LOC). The more LOC, the bigger is the software, the more opportunities for inject defects we have.

With the same amount of defects. The bigger the software is, the smaller the density.

1.000 LOC = 1 KLOC

Example

Product A - Version 1

 

  • 20 Defects reported by end-users
  • 10 Defects detected but not reported by end-users
  • From the overall 30 defects, 15 Critical ones.
  • Size: 30 KLOC

PLEASE CALCULATE THE DIFFERENT DEFECT DENSITIES YOU CAN IMAGINE

Example

Product A - Version 1

 

  • 20 Defects reported by end-users
  • 10 Defects detected but not reported by end-users
  • From the overall 30 defects, 15 Critical ones.
  • Size: 30 KLOC
DD (on-the-field) = 20 / 30 = 0.66 Defects found on field / KLOC

DD (not-found-on-the-field) = 10 / 30 = 0.33 Defects not found on field / KLOC

DD (all) = 30 / 30 = 1 defect / KLOC

DD (critical) = 15 / 30 = 0.5 Critical Defects / KLOC

Example

Product A - Version 2

  • We have fixed all the 30 Version 1 detected defects
  • 5 New defects reported by end-users
  • 5 New defects detected but not reported by end-users
  • From the overall 10 defects, 5 Critical ones.
  • Size: 40 KLOC (30 old KLOC + 10 new KLOC)

DO YOU THINK THE PRODUCT IS BETTER NOW? DO YOU THINK THE TEAM HAS DONE A BETTER JOB?

Example

Product A - Version 2

We have fixed all the detected 30 defects in Version 1

5 New defects reported by end-users

5 New defects detected but not reported by end-users

From the overall 10 defects, 5 Critical ones.

Size: 40 KLOC (30 old KLOC 10 new KLOC)

Defect Density?

Which number would you choose as denominator?

Example

Product A - Version 2

We have fixed all the detected 30 defects in Version 1

5 New defects reported by end-users

5 New defects detected but not reported by end-users

From the overall 10 defects, 5 Critical ones.

Size: 40 KLOC (30 old KLOC 10 new KLOC)

DD (on-the-field) = 5 / 40 = 0.125  Defects / KLOC

DD (not-on-field) = 5 / 40 = 0.125 Defects / KLOC

DD (all) = 10 / 40 = 0.25 Defects / KLOC

DD (critical) = 5 / 40 = 0.125 Defects / KLOC
DD (on-the-field) = 5 / 10 = 0.5  Defects / KLOC

DD (not-on-field) = 5 / 10 = 0.5 Defects / KLOC

DD (all) = 10 / 10 = 1 Defects / KLOC

DD (critical) = 5 / 10 = 0.5 Defects / KLOC

Counting all Lines

Counting just new lines

Example

The team has done a similar job, the process has about the same quality but the perceived quality of the product is beter

Version 1 Version 2 counting all Version 2 counting new
DD on-the-field 0.66 0.125 0.5
DD not-on-the-field 0.33 0.125 0.5
DD all 1 0.25 1
DD Critical 0.5 0.125 0.5

For an end-user point of view this makes sense, more features, bigger software, fewer defects, smaller defect density

But this doesn't seem to work well. The team developed a third part of LOC in phase 2 and injected a third part of defects. The team has not improved and this metric could seem to show it has done a better job.

If you just focus on the absolute figures, this could be misleading: for end-users we are improving the quality but we might be doing worse and worse in every iteration

YOU NEED TO UNDERSTAND WHAT YOU ARE MEASURING, OTHERWISE, IT'S JUST A NUMBER OF NO HELP TO YOU

NOW, LET'S FOCUS ON THE DENOMINATOR

ARE THE LINES OF CODE A GOOD MEASUREMENT OF PRODUCT SIZE?

WHAT IS A LOC?

When the only programming language was assembler, this could be easy:

 

Physical Line = Instruction = LOC

But now, there are multiple programming languages with different approaches that includes comments, control sentences, logical lines that occupy multiple screen lines

 

... and as programming languages are very flexible, the same programming language could be used in different styles

WHAT IS A LOC?

  • EXECUTABLE LINES
  • EXECUTABLE LINE + DATA DEFINITIONS
  • EXECUTABLE LINES + DATA DEFINITIONS + COMMENTS
  • EXECUTABLE LINES + DATA DEFINITIONS + JOB CONTROL LINES
  • PHYSICAL LINES ON AN INPUT SCREEN
  • LINES TERMINATED BY LOGICAL DELIMITERS

Is it a good measurement of how big the code is? Maybe we should not talk about the size of the code in terms of length but in terms of how many opportunities for injecting defects there are. (OFE)

 

for (i=0; i<100; ++i) printf("I love compact coding"); /* what is the number of lines of code in this case? */
/* How many lines of code is this? */
for (i=0; i<100; ++i)
{
  printf("I am the most productive developer");·
}
/* end of for */
1 LOC if I count lines limited by line breaks
6 LOC if I count lines limited by line breaks, 4 if I don't count comments...

Conclusion: If I want to measure how many opportunities to inject defects are there in the software, using Lines of Code is not the best approach

The opportunities for injecting defects are about the same in both examples, but the LOC count is very different

EXAMPLE

LOC BEYOND QA

Remember the Goodhart's Law: If a metric becomes a target, it's not useful anymore

If I want to improve productivity, and for that, my target is increasing the number of LOC per developer-month, it could have a very negative impact on the project (devs can start doing stupid things such as adding unneeded comments)

FUNCTION POINTS

  • Alternative way to measure software size

  • Useful for quality purposes but also for measuring team productivity in a fair way

  • Created by Albrecht at IBM in the mid-1970s

  • Very-very-very bad name: it does not count the functions

  • It counts different aspects to determine how complex a software is

  • It's agnostic of the programming language and development styles

WHAT?

  • External Inputs (EI): Process in which data comes inside from the outside (e.g. from an input screen from another app...)
  • External Outputs (EO): Process in which data goes from inside to outside. The data must be derived data (i.e. data that was not stored directly but that has been calculated based on other data)
  • External Inquiries (EQ): Similar to EO but the data must not be derived data.
  • Internal Logical Files (ILF): A group of logically related data that resides inside the application (and hence maintained by EI).
  • External Interface Files (EIF): A group of logically related data that resides outside of the app and is maintained by other app.

KEY CONCEPTS

Need to count the amount of:

CALCULATING FUNCTION POINTS

1 - Count Number of EIs, EOs, EQs, ILF, EIF 
X1 High
Y1 Mid
Z1 Low
2 - Divide every bucket you have counted in 3 depending on its complexity (Low, Medium, High) 
3 - Multiply the count of every bucket by the predefined factor (based on a table) and add all to calculate the Function Count
EIs
EOs
EQs
ILF
EIF
X2 High
Y2 Mid
Z2 Low
X3 High
Y3 Mid
Z3 Low
X4 High
Y4 Mid
Z4 Low
X5 High
Y5 Mid
Z5 Low
#EIs
#EOs
#ILFs
#EQs
#EIFs
X1*Factor-EI-High + Y1*Factor-EI-Mid + Z1*Factore-EI-Low + X2*Factor-EO-High... 
X5*Factor-EIF-High + Y5*Factor-EIF-Mid + Z5*Factore-EIF-Low = FUNCTION COUNT

 

4 - Multiply the Function Count by the adjustment factor that depends on the type of software
FUNCTION COUNT * VALUE ADJUSTMENT FACTOR = FUNCTION POINTS
In order to fill in the table we need to: 
 - Know how to count the components 
 - Know how to classify depending on complexity 
 - Know how to calculate the Value Adjustment Factor

 

Function Points = FC * ValueAdjustmentFactor
 Know how to classify depending on complexity 
FTR (File Types Referenced): Number of files updated or referred 
DET: Number of unique fields in the files
RET (Record Element Type): is a user recognizable subgroup of data elements (e.g. a table in a DB)
 
DET: unique user recognizable, non recursive field
 Know how to calculate the Value Adjustment Factor
Based on a list of 14 characteristics and evaluate the degree in terms of effect in the software from 0 to 5 (ci). After that, apply the following formula:
  1. Data communications: How many communication facilities are there to aid in the transfer or exchange of information with the application or system?
  2. Distributed data processing: How are distributed data and processing functions handled?
  3. Performance: Did the user require response time or throughput?
  4. Heavily used configuration: How heavily used is the current hardware platform where the application will be executed?
  5. Transaction rate: How frequently are transactions executed daily, weekly, monthly, etc.?
  6. On-Line data entry: What percentage of the information is entered On-Line?
  7. End-user efficiency: Was the application designed for end-user efficiency?
  8. On-Line update: How many ILF’s are updated by On-Line transaction?
  9. Complex processing: Does the application have extensive logical or mathematical processing?
  10. Reusability: Was the application developed to meet one or many user’s needs?
  11. Installation ease: How difficult is conversion and installation?
  12. Operational ease: How effective and/or automated are start-up, back-up, and recovery procedures?
  13. Multiple sites: Was the application specifically designed, developed, and supported to be installed at multiple sites for multiple organizations?
  14. Facilitate change: Was the application specifically designed, developed, and supported to facilitate change?
Characteristics:

You are now ready to count Function Points

 - Count the components 
 - Classify depending on complexity 
 - Calculate the Value Adjustment Factor

 

A simple example on the difference between FP and LOC

Assembly Version Java Version
LOC 1000 200 Java is higher level and hence requires fewer LOC
FP 5 5 As the SW has the same features, FP are equal
Coding Effort 2 months 1.25 months Using a higher level language helps to reduce times
Cost per month $5,000 $5,000 The cost of the team per month is exactly the same
Cost $10,000 $6,250 As the team spend less time, the cost was smaller
LOC per month 500 160 However, the number of LOC per month decreases
FP per month 2.5 4 While the number of FP per month grows
$ per LOC $10 per LOC $31.25 per LOC The cost per LOC is higher... BUT it's not important
$ per FP $2,000 per FP $1,250 per FP As the important thing is cost per functionality which reduces a lot

After developing an assembly version of one software we want to move to a higher level programming language (Java). Please check the impact on the project figures:

Function Points Examples

Intrinsic End Product Metrics

End Product

In Process

Intrinsic

Customer

Quality Metrics

Customer Problem Metrics

What if we want to measure the quality of the product from an end-user point of view?

What would be a good metric?

IDEAS?

User Problems

We should not talk about defects but about users' problems

What is a user problem?

User Problems

We should not talk about defects but about users' problems

What is a user problem?

  • Usability problems.
  • Unclear documentation or information.
  • Duplicates of valid defects (defects that were reported by other customers and fixes were available but the current customers did not know of them).
  • User errors.

Everything users perceive as a problem

User Problems

When counting user problems, the total count is going to be affected by the total number of users.

E.g. If 1million users, half of them report a similar problem, I have 500.000 users with a problem

Problem Density

Needs to take into account the amount of users... but also how long they have been using the product

Users-Months of usage.

 

1.000 users, using a product during 1 year are 12.000 users-month

(The software has been used during 12.000 months)

Problems per User Month

PUM =

Problems Reported

Months of usage

PUM vs. DD

DIFFERENCES BETWEEN PROBLEM USER-MONTH AND DEFECT DENSITY?

PUM vs. DD

CUSTOMER SATISFACTION METRICS

ASK DIRECTLY TO END-USERS

In Process Quality Metrics

End Product

In Process

Intrinsic

Customer

Quality Metrics

In Process Quality Metrics

Calculated during the development of the product

 

Most of them are based on:

a/ the number of defects detected

b/ when are they detected

c/ when are they fixed

Defect Density after a development/testing cycle

Calculate the Defect Density of the non-final product after a development cycle (e.g. iteration, sprint, etc.) or after a testing cycle (e.g. integration testing)

 

Keep track of the evolution of this metric over the different cycles: E.g. is the metric getting better or worse in every sprint?

Defect Density after a development/testing cycle

Purpose: get an indication of the potential Defect Density of the final product when it's on the field

 

Why do you think it's important to get that indication?

 

Myers suggested a counter-intuitive principle that the more defects found during testing, the more defects will be found later: Positive correlation between defect rates during development/testing and on the field.

 

In general, we could try to identify patterns in the evolution of the Defect Density

Defect Density after a development/testing cycle

Example A

Example B

Defect Density after a development/testing cycle

Defect Density after a development/testing cycle

But... can you think of any reason for detecting more defects but not because the software is getting worse?

Defect Density after a development/testing cycle

The defect rate is same or lower that on previous iteration (or a similar product). But has been testing worse?

YES

NO

The defect rate is higher than previous iteration. But, did we plan to test more thoroughly?

YES

NO

Defect Arrival Pattern

Although the previous metric is useful, is not enough to understand the progress of the development team:

1 - Because it's a discrete function: we only measure it after an iteration

2 - Because as any Defect Density, it tends to improve as the product matures: when fewer features are introduced, fewer defects are injected and hence can be fixed faster (fixed defects are not counted in Defect Density)

 

We use the Defect Arrival Pattern to complement the Defect Density.

What do you think it's the defect arrival pattern?

Defect Arrival Pattern

DAP: Distribution of the defects detected over the time

There are two ways to represent it: Rate or Cumulative

Rate

Day1

Day2

Day3

Day4

Day5

Day6

Day7

2

4

5

5

3

4

4

Defects

Day1

Day2

Day3

Day4

Day5

Day6

Day7

2

6

11

16

19

23

27

Time

Time

Defects / day

Defects

Defect Arrival Pattern: Example

Imagine this was part of a single iteration. Which one would have the best Defect Density?

Defect Arrival Pattern: Variations

Valid/All Defects: We could count all the defects reported or only those that have confirmed as valid

Defect Severity: Maybe we are just interested in the critical/major defects

Defect Removal Metrics

So far, we have talked about metrics related to the defects that I have detected.

 

Not all the defects that are detected can be immediately removed: Remember that a defect is just the visible symptom of something that needs to be fixed. But in order to do so, many actions must be done:

 

- Is it a valid defect?

- What is the root behind the defect?

- How complicated is to fix it?

- By fixing it, am I breaking other functionalities?

....

Can you think on some metrics to take this into account?

Defect Removal Pattern

It describes the distribution of removed defects over time.

 

It can be done per-unit-of-time or per-iteration.

 

But this metric in a isolated way it's quite useless. There are some additional ones that complement it:

 

- Average time to fix a defect

- Average time to detect a defect

 

Remember that the cost of a defect is a higher, the later we find it and the later we fix it

Defect Backlog / Burdown

A burn-down chart is a graphical representation of work left to do vs. time

Typical Agile Burn-down chart

Defect Backlog / Burdown

 work left: number of defects remaining that

 can go up (new defect found) or go down (defect fixed)

Defect Backlog / Burdown

In an ideal world, before releasing a product both curves should be at the same point. What can we do to make it happen?

 

Defect Backlog / Burdown

In an ideal world, before releasing a product both curves should be at the same point. What can we do to make it happen?

  • Reduce time to fix defects: more resources
  • Inject fewer defects by stop adding features at some point and preventing any regression because of fixes. In some cases, this could mean reduce product scope.
  • Spend more time removing defects
  • Reduce the criticality of defects to be fixed at some point of time. This has two effects:
    • Reduces the number of defects
    • Reduces the opportunity for bad fixes / regressions

 

In summary, the classic quality, scope, time, resources dilemma

 

Defect Removal Effectiveness

Measures how good my process is with respect to detect and remove defects: "How many defects I have removed from the potential list of defects that I could have remove?"

 

This question could be asked globally or in any phase/iteration.

 

Trying to be more formal:

 

 - DRE = (Defects Removed / Defects Latent)*100 %

 

where Defects Latent = Defects Removed + Defects Found Later

 

Defect Removal Effectiveness

An example

For instance, during the development a product I detected and fixed 80 defects. When the product hit the market, 20 additional defects were discovered.

 

DRE = Defects Found / Latent Defects = 80 / (80+20) = 80%

 

In average, I have removed 80 of every 100 defects I injected.

Defect Removal Effectiveness:

Another view

Defect Removal Effectiveness:

Another example

IT1 IT2 IT3 IT4 TOTAL REMOVED
IT1 5 5
IT2 10 15 25
IT3 5 5 10 20
IT4 5 5 0 5 15
TOTAL INJECTED 25 25 10 5 65
During It1 25 defects were injected. 5 of them were fixed during the same iteration, 10 in It2, 5 in It3 and 5 in It4.
During It4 15 defects were removed. 5 of them were introduced in It1, 5 in It2 and 5 in It4.

What is the DRE of all the phases?

Defect Removal Effectiveness:

Another example

IT1 IT2 IT3 IT4 TOTAL REMOVED
IT1 5 5
IT2 10 15 25
IT3 5 5 10 20
IT4 5 5 0 5 15
TOTAL INJECTED 25 25 10 5 65
During It1 25 defects were injected. 5 of them were fixed during the same iteration, 10 in It2, 5 in It3 and 5 in It4.
During It4 15 defects were removed. 5 of them were introduced in It1, 5 in It2 and 5 in It4.

DRE-IT1 = 5 / 25 = 20%

DRE-IT2 = 25 / (25+25) - 5 = 25 /45 = 55%

DRE-IT3 = 20 / (25+25+10) - 5 - 25 = 20 / 30 = 66%

DRE-IT4 = 15 / (25+25+10+5) - 5 - 25 - 20 = 15/15 = 100%

DRE = 65 / 65 = 100%

Defect Removal Effectiveness:

Another example

IT1 IT2 IT3 IT4 TOTAL REMOVED
IT1 2 2
IT2 2 3 5
IT3 4
2
4
10
IT4 2
1
2
3
8
ON THE FIELD 2 1 1 1 5
TOTAL INJECTED 12 7 7 4 30
During It1 25 defects were injected. 2 of them fixed in It1, 2 in It2, 4 in It3, and 2 in It4. 2 were only discovered on the field.
During It4 8 defects were removed. 2 of them were introduced in It1, 1 in It2, It3, It4.

What is the DRE of all the phases?

On the field we discovered 5 remaining defects that were introduced: 2 in It1 and 1 in It2, It3, It4.

Defect Removal Effectiveness:

Another example

IT1 IT2 IT3 IT4 TOTAL REMOVED
IT1 2 2
IT2 2 3 5
IT3 4
2
4
10
IT4 2
1
2
3
8
ON THE FIELD 2 1 1 1 5
TOTAL INJECTED 12 7 7 4 30
During It1 25 defects were injected. 2 of them fixed in It1, 2 in It2, 4 in It3, and 2 in It4. 2 were only discovered on the field.
During It4 8 defects were removed. 2 of them were introduced in It1, 1 in It2, It3, It4.
On the field we discovered 5 remaining defects that were introduced: 2 in It1 and 1 in It2, It3, It4.

DRE-IT1 = 2 / 12 = 16.67%

DRE-IT2 = 5 / (12+7) - 2 = 5 / 17 = 29.41%

DRE-IT3 = 10 / (12+7+7) - 2 - 5 = 10 / 19 = 52.63%

DRE-IT4 = 8 / (12+7+7+4) - 2 -5 - 10 = 8 / 13 = 61.54%

DRE = 2+5+10+8 / 12+7+7+4 = 25/30 = 83.33%

Defect Removal Effectiveness

Injecting vs. Removing defects

 

Software Metrics vs. Quality Metrics

We have been discussing so far Quality Metrics, but it's interesting to check some Software Metrics because, as we studied in Unit 1, internal quality affects external quality:

 

Internal Software Metrics can affect External Quality Metrics in the long-term

Software Metrics vs. Quality Metrics

Quality is linked to Size, Control Flow Complexity, Complexity, Understandability, Testability

 

There are some Software metrics that are linked to them: Average method size, Cyclomatic Number, Average Number of methods/instance variables per class, nesting level, Number of classes/relationships within in a module or outside of the module...

 

Understanding the relationship between them is critical

Copy of UNIT 2