Information Sharing and ShipConstructor

Pat David, R&D

Leveraging Information

From Work Packages to ERP/MRP/PDM/PLM

-Archimedes

"Give me a lever long enough

and a fulcrum on which to place it,

and I shall move the world."

PREVIOUS SOLUTIONS

CAD to ERP

CAD to Production Planning

ShipWeight

WAYS TO INTEGRATE

SQL Access

Datalayer API

Native Formats

SQL

API

FILES

Programmers

Production

FROM dbo.GEN_tblAssemblies AS Assemblies2 INNER JOIN
   dbo.GEN_tblRanks AS r ON Assemblies2.RankGUID = r.RankGUID INNER JOIN
   dbo.GEN_tblBuildStrategies AS bs ON r.BuildStrategyGUID = bs.BuildStrategyGUID LEFT OUTER JOIN
   dbo.GEN_tblAssemblies AS B ON B.LeftValue =
     (SELECT     MAX(LeftValue) AS Expr1
       FROM          dbo.GEN_tblAssemblies AS S
       WHERE      (Assemblies2.LeftValue > LeftValue) AND (Assemblies2.LeftValue < RightValue)) LEFT OUTER JOIN
   dbo.GEN_tblAssemblies AS Assemblies1 ON Assemblies1.LeftValue BETWEEN Assemblies2.LeftValue AND Assemblies2.RightValue LEFT OUTER JOIN

Images

DWF

DXF

PDF

PCF

SAT

STEP

IGES

eBOM

mBOM

Navisworks

DWG per part

4D Simulation

Undetailed DWG

Profile CUtting

TSV

Available

NOW

Contact Details

Patrick.David

@ssi-corporate.com

[ShipWeight] Information Sharing and ShipConstructor

By Pat David

[ShipWeight] Information Sharing and ShipConstructor

  • 287