Flat Roof Product Installation

8 Slides

Keylite Accredited Installer Academy

Flat Roof Glass Installation

1. Flat Roof Glass (FRG)

2. Flat Roof Dome (FRD)

Structural opening size and curb size

Keylite Accredited Installer Academy

Flat Roof Glass Installation

Curb and roof pitch requirements

Keylite Accredited Installer Academy

Flat Roof Glass Installation

The roof material used to weather the roof must be ran up to the underside of the white lip of the PVC upstand

Keylite Accredited Installer Academy

Flat Roof Glass Installation

Roof material being bitumen felt or torch on systems

 

Keylite Accredited Installer Academy

Flat Roof Glass Installation

Fixing the glass top to the PVC upstand.

 

Keylite Accredited Installer Academy

Flat Roof Glass Installation

Thread the screws into the screw cover cap base and place the screws into the provided marking groove  on the side of the glass top unit. Space the screws around the full perimeter at a max of 300mm spacing from each other and 80 – 100mm in each corner and tighten them fully.

 

Keylite Accredited Installer Academy

Flat Roof Glass Installation

Quiz

Please continue to the quiz below

KAI | Flat Roof Product Installation

By Keylite Web Team

KAI | Flat Roof Product Installation