Status of CHARA telescopes
The CHARA Science Meeting 2026 - Soccoro



Where does CHARA have single point failures....
i.e. where the nightmares lie?
- aging equipment
- time sinks
- lack of spares
- discontinued components
- supply chains becoming questionable
- other risks
still....but slightly less so
- Mirror recoats - W2, E2 ​
- New drives - S2EL, W1EL, E1EL, S1AZ
- New cylinder control
- New AOB & TEMA - to be installed soon at S2
- PI actuators & TT piezos, cal source and other Ametek-Haydon-Kerk-Pittman motors - will need future replacement/upgrades
- CHARIOT
- Future
- ​​AC, replace all AOB/TEMA/Crypt controlers, new cable puller, new spycams
- hexapods
- ​​AC, replace all AOB/TEMA/Crypt controlers, new cable puller, new spycams

Mirror recoats
| scope | date last done | tbd |
|---|---|---|
| S1 | 4-2022 | 2026 |
| S2 | 8-2021 | 2026 |
| W1 | 2-2025 | 2027 |
| W2 | 1-2026 | 2028 |
| E1 | 12-2024 | 2027 |
| E2 | 1-2026 | 2028 |





- TelAO WFS for fine alignment
- camera for alignment scope speeds and improves EL axis alignment



cylinder upgrade


Drive Upgrade - S2EL, W1EL, E1EL, S1AZ
-
Existing drives are ~25 years old & discontinued
-
12 drives and motors (plus spare) in hand from Parker
-
Drive assemblies fabrication done, only needs SPA mod
-
Spare Dojen obtained
-
Install during daytime during semester, but some night hrs needed for software and tuning
-
Should be able to finish by end of next winter shutdown
-
move to pulse mode + RPi+custom hat pulse generator
-
E1EL bearing replaced - made spares





current:
- single motor driver (r256)
- multiplexed relays
- daisy chained
- sequential operation only
- little or no feedback, timing-based
- very difficult to diagnose/repair
- not necc. interchangable
ideal (see Noy's talk):
- 1 drive per axis
- no multiplexing
- parallel operation
expensive (>$10k/scope)- <$3k

Tiptilt, PZT issues, actuators, hexapods?


hexapod/piezo tiptilt system
- needs to function hanging upside down
- ~$40-50k each



-
TT PZT & actuator concerns
- PI P-855.20 PZT's discontinued in 2018 - no working spares
-
can use DM for TT but no on-sky reconstructor
-
could replace with Thorlabs PZT's or PI M-227.25 actuators+PZT
-
PI M-224.20 actuators discontinued in 1992 - 1 spare
CHARIOT



K=5.2 so far, new pickoff,
new pc, CREDOne,
new output optics, dichroics,
FT w/ MIRCX, moving to 4 beam
sub-1% diameter precision for K<=2




"Towards quantum-enhanced long-baseline optical/near-IR interferometry"
Rajagopal et al. (2024)


Initial HBT experiments with BNL


Plan Outline:
- Phase 0: AC at telescopes
- Phase 0.1: new IR dichroics for beam samplers
- Improve multi-wavelength performance
- Wider bandwidth for better STST performance
- CRED1, bluer for science, WFS on a single chip?
- Dual-star phase reference mode
- Phase 0.5: upgrades of telAO
- Redesign M2, go to focal design?
- Phase 1: central 2m + AO + OPLE upgrades
- LabWFS control new telDM,
- Longer delay + better metrology or double-decker carts
- Visible-sensitivity, resolution, stability → needed for nulling
- Phase 2: replace 1m's with 2m's
- Propagate upgrades from central 2m
- Phase 3: full CMA - outer km baseline fiber array

Outreach - Shadow the Scientists, Universe Today, All Science Considered (upcoming)
RIP "Winky"
(?-2025)