Begin by stripping off current roof back to bare decking with new ply
STEP 2
Remove arris rails from any open edges, fit 2” x 1” timber batten around the perimeter
STEP 3
Begin laying RubberCover EPDM in the correct position then wait 20 minutes for it to set in place
STEP 4
Fold over one half of the membrane back after it has been stirred. Once done, apply water-based adhesive to the deck. Repeat this on the other half of the roof. Make sure you that sweep out any bubbles to smooth out the rubber