Machining metre-sized gratings with nanometre accuracy
We aim to make large diffraction gratings
Grating requirements
Up to 1.6m x 0.3m in size
Random error in groove position < 15nm
Cyclic errors < 1nm
Based on wet-etching of silicon
Overall concept
Concept sketch
Testing gratings optically
Original timeline from grant proposal
Manufacturing metre-sized gratings 2022-10
By dbuscher
Manufacturing metre-sized gratings 2022-10
174